Project Results
During the stage of old pavement removal and pipeline renovation, the operational efficiency of the equipment was enhanced by 6 times compared to traditional manual methods. The construction period for a single section was reduced to 15 days.
The equipment was capable of flexibly adapting to multiple construction processes, thereby reducing the cost of additional equipment rentals and lowering the overall construction cost by 10%.